Client: Rahim Iqbal

Client: Rahim Iqbal

Date of completion: Jan, 2022

Project brief / how did it go?

Living room extension plus an addition of a new room to be used as a dining room.

From the onset of digging the foundations it has been so difficult as our ground was not very good due it being on an old coal mining site. Took longer than expected with soo many complications at almost every stage.

Finally got there and almost complete by Jan 2022.

Proposed images

Testimonial

As mentioned above the build stage has been enormously difficult with countless complications. However the one thing that kept me sane and gave me confidence was John.

I cannot thank this man enough.

From the design stage and literally through all complications, John has always either been physically present or  available on the phone. He had been out to me numerous times to look at the build stages and spoke to the tradesmen and made sure everything was going to plan. The builders felt very comfortable in taking expert advice from John which also reassured me even further.

John has vast amounts of knowledge and is a very calming individual.

From meeting John at the initial design stage I knew his experience and knowledge would be what I need for my project. Coming towards the end of the project the house looks just as we planned at the initial 3D design stage and I cannot thank John enough for helping me through the many difficult obstacles.

I would highly recommend John to family and friends.